Facility Alteration Permit (FAP) request
All new construction, alterations and applicable contractor activities on Airport Lands need to have written approval in the form of a Facility Alteration Permit (FAP).
To find out if you need an FAP, contact the Construction Compliance and Permits Office (CCPO) at constructioncompliance@gtaa.com.
Application requirements
Your FAP application must include the following:
- Completed (FAP or QuickFAP) Application for Airport Construction
- Sealed and signed Issued for Construction design drawings and documents
- Completed Letter of Undertaking (for tenant work only)
- Completed General Review Commitment Certificates (GRCC) from each applicable discipline
- Contractor’s Safety Documentation, which must include their Project Specific Safety Plan, NOP (if required) and Form 1000
Refer to CCPO Guide - FAP Process NOP Requirement 2025.
Applications with no code issues can be expedited using the QuickFAP process, which only includes the contractor’s safety review. To find out if your project can use the QuickFAP process, email constructioncompliance@gtaa.com.
For more information, read the Airport FAP Application Guide 2025.
Invitation to review (ITR)
Once the FAP application package is received, the CCPO will determine which independent consultants need to be involved in the project’s FAP Review Process.
An ITR will then be sent to one or all the following independent consultants depending on the scope of work:
- The Independent Code Compliance Consultant (ICCC)
- The Independent Construction Safety Consultant (ICSC)
- The Independent Utility Locates Contractor (IULC)
We will then send an Application Review Notice (ARN) email to the FAP Applicant detailing the specific requirements or additional information that may be required before the FAP (Orange Placard) can be issued.
Requirements for issuing a FAP (orange) placard
Before issuing a FAP placard, the CCPO must have the following:
- Confirmation that all code issues have been addressed by the applicant and a letter has been issued by ICCC recommending that the FAP be issued (as applicable)
- Confirmation from ICSC that they have received and reviewed all required contractor’s safety documentation
- Submission of any additional information that may have been requested in the ARN sent to the applicant when the application was received
Approval
Once CCPO has received all required information and completed its review, they will notify the applicant by email of FAP approval.
To pick up your FAP placard, contact ICSC directly. The placard must be posted on-site prior to starting any contractor activities.
FAP documents you may need
Airport construction codes and forms
- Application for Airport Construction 2025
- Assurance of Professional Review & Compliance form 2025
- General Review Commitment Certificate form 2025
- Tenant Letter of Undertaking Form 2025
- Request for Inspection Form 2025
- Request for GTAA Utilities Locates Form 2025
Guides and reference documents
- FAP Application Preparation Guide 2025
- FAP Closeout Checklist & Guide 2025
- FAP Fees Schedule 2025
- Surface Penetration Guidelines 2025
- Surface Penetration Checklist & Sign-off Form 2025
- Hot Work Sign-off Checklist form & Airport Conditions 2025
- GTAA Contractor Safety Plan Review Guide 2024
- GTAA Work Specific Safety Plan form 2025
- Construction vs. Maintenance Activities Guide 2025